For many deep pour projects, you need to block from the substrate perimeter with A brief dam, with railings, or with lifted edges, since this epoxy can move proper off the area and onto the House beneath it because of its lessen viscosity. Epoxy Extended open up time a hundred% https://bookmarkassist.com/story19170370/concrete-coating-no-further-a-mystery