As seen from the figure beneath, constant auger is utilized to drill the borehole, elevate up drilled soil, and pour concrete while the auger is moved up. Due to this fact, the borehole isn't going to want casing or hydrostatic strain to avoid damage to the borehole wall. In this https://roberta825xhr1.wiki-jp.com/user